OVONIC 11.1V 150C 850mAh 4S LiPo Battery with XT30 Plug for 4S FPV Cinewhoop & Racing Drones
OVONIC 11.1V 150C 850mAh 4S LiPo Battery with XT30 Plug for 4S FPV Cinewhoop & Racing Drones
✅ Made In USA
✅ Quick Delivery
✅ Cruelty Free
Couldn't load pickup availability
-
Ordered
- - -
Order Ready
- - -
Delivered
OVONIC 11.1V 150C 850mAh 4S LiPo Battery with XT30 Plug for 4S FPV Cinewhoop & Racing Drones
OVONIC 11.1V 150C 850mAh 4S LiPo Battery with XT30 Plug for 4S FPV Cinewhoop & Racing Drones
Take your 4S FPV Cinewhoop and racing drones to the next level with OVONIC 11.1V 150C 850mAh 4S LiPo Battery. Designed for high-performance drones, this battery delivers reliable power, quick acceleration, and longer flight times. With a 150C discharge rate and 850mAh capacity, it ensures stable and powerful performance in intense racing or freestyle sessions. The XT30 plug ensures a secure connection and stable power transfer for your drone's needs.
Key Features:
- High Discharge Rate (150C): Perfect for high-power applications, providing instant bursts of power for precise control and smooth handling.
- Compact and Lightweight Design: With a net weight of 99g, this 4S battery is compact yet powerful, enhancing agility and maximizing flight time.
- XT30 Plug for Secure Connection: XT30 plug guarantees a strong and reliable power connection, minimizing power loss even in high-speed maneuvers.
- Extended Flight Time: Ideal for 4S FPV Cinewhoops and racing drones, it offers the right balance of power and flight duration.
Compatibility: This battery is compatible with a wide range of 4S FPV Cinewhoop drones and racing drones in the 90-180mm size range that require a 150C discharge rate for maximum performance.
- FPV Cinewhoops: Emax Tinyhawk II, BetaFPV 85X
- Racing Drones: Diatone GT-R90, GEPRC Phantom, iFlight Nazgul 5
Specifications:
- Brand: OVONIC
- Capacity: 850mAh
- Voltage: 11.1V
- Discharge Rate: 150C
- Configuration: 4S1P
- Net Weight: 99g (0.20lb) per pack
- Size: 60.5 x 30 x 30.4 mm (2.38 x 1.18 x 1.20 inches)
- Connector Type: XT30 Plug
- Balancer Connector Type: JST-XHR-4P
- Wire Gauge: 16 AWG
Package Contents:
- 1 x OVONIC 850mAh 4S 150C LiPo Battery with XT30 Plug
- 2 x Brand Stickers
- 1 x User Manual
Important Notes:
- Ensure that the voltage and plug type match your drone for compatibility.
- Stop charging immediately when the cell voltage reaches 4.2V per cell (normal voltage is between 3.7V - 4.2V).
- Safety Check: Before use, inspect the battery for damage and verify that the voltage is within a safe range.
- If the battery fails to hold a charge or loses charge quickly, use a Balance Charger and cycle the battery several times.
-
Share positive thoughts and feedback from your customer.
Author -
Share positive thoughts and feedback from your customer.
Author -
Share positive thoughts and feedback from your customer.
Author
check_box
Collapsible row
Collapsible row
